zetarun
zetarun

Reputation: 787

Hot deploy on Heroku with no downtime

A bad side of pushing to Heroku is that I must push the code (and the server restarts automatically) before running my db migrations.

This can obviously cause some 500 errors on users navigating the website having the new code without the new tables/attributes: the solution proposed by Heroku is to use the maintenance mode, but I want a way with no downside letting my webapp running everytime!

Is there a way? For example with Capistrano:

...and I have no downtime!

Upvotes: 36

Views: 11825

Answers (7)

Yoko
Yoko

Reputation: 803

Right now I don't see any possibility to do this without downtime. I hate it too.

This console command does it in the smallest amount of time I can think of

git push heroku master && 
heroku maintenance:on && 
sleep 5 && 
heroku run rails db:migrate && 
sleep 3 && 
heroku ps:restart && 
heroku maintenance:off
  1. git push heroku master to push the master branch to heroku
  2. heroku maintenance:on to put on maintenance so no 500s
  3. sleep 5 to let the dynos start up the new code (without it, the migration might fail)
  4. heroku run rails db:migrate to do the actual migration
  5. heroku ps:restart out of experience the restart makes sure the new dynos have the latest schema
  6. heroku maintenance:off turns of the maintenance

You might have to add -a <app name> behind all heroku commands if you have multiple apps.

Just one command will run these in series in terminal on Mac OSX.

Upvotes: 0

dB.
dB.

Reputation: 4770

If you're able to live with two versions of the same app live at the same time, Heroku now has a preboot feature.

https://devcenter.heroku.com/articles/preboot

Upvotes: 12

bevanb
bevanb

Reputation: 8521

I first commit the migrations, run them, then push the rest of the code. Add a single file like so:

git commit -m 'added migration' -- db/migrate/2012-your-migration.rb

Upvotes: 2

michael
michael

Reputation: 2997

You actually will have some downtime when Heroku restarts your app. They have a new feature called Preboot that starts up new dynos before taking out the old ones: https://devcenter.heroku.com/articles/labs-preboot/

As for database migrations, that article links to this one on how to deal with that issue: http://pedro.herokuapp.com/past/2011/7/13/rails_migrations_with_no_downtime/

Upvotes: 3

jshkol
jshkol

Reputation: 1877

You could setup a second Heroku app which points to the same DB as your primary production app and use the secondary app to run your DB migrations without interrupting production (assuming the migrations don't break the previous version of your app).

Let's call the Heroku apps PRODUCTION and STAGING.

Your deploy sequence would become something like:

  1. Deploy new code to STAGING
    git push heroku staging
  2. Run database migrations on STAGING (to update PROD db)
    heroku run -a staging-app rake db:migrate
  3. Deploy new code to PRODUCTION
    git push heroku production

The staging app won't cost you anything since you won't need to exceed Heroku's free tier and it would be pretty trivial to setup a rake deploy script to do this for you automatically.

Good luck!

Upvotes: 22

iwasrobbed
iwasrobbed

Reputation: 46703

The only method to improve the process somewhat is what this guy suggests. This is still not a hot deploy scenario though:

http://casperfabricius.com/site/2009/09/20/manage-and-rollback-heroku-deployments-capistrano-style/

One thing I would suggest is pushing only your migrations up to Heroku first and running them before you push your codebase. This would entail committing the migrations as standalone commits and manually pushing them each time (which is not ideal). I'm very surprised there is not a better solution to this issue with all of the large apps hosted on Heroku now.

Upvotes: 5

shingara
shingara

Reputation: 46914

Heroku can't deploy by capistrano. You are block by tool released by heroku.

The no downtime system is impossible in all cases. How change your schema with big change without stop your server. If you don't stop it, you can avoid some change and your database can be inconsistent. SO the using of maintenance page is a normal solution.

If you want a little solution to avoid problem is a balancing in two server. One with only read database during your migration. You can switch to this instance during your migration avoiding the maintenance page. After your migration you come back to your master.

Upvotes: 0

Related Questions