Reputation: 43
I have a DAQ for Temperature measurment. I take a continuous sample rate and after DAQ, calculating temperature difference per minute (Cooling Rate: CR) during this process. This CR and temperature values are inserted into the Matlab script for a physical model running (predicting the temperature drop for next 30 sec). Then, I record and compare the predicted and experimental values in LabVIEW.
What i am trying to do is the matlab model is executing every 30 sec, and send out its predictions as an output from matlab script. One of this outputs helps me to change the Air Blower Motor Speed until next matlab run( eventually affect the temperature drop for next 30 sec as well, which becomes a closed loop). After 30 sec while main process is still running, sending CR and temperature values to matlab model again, and so on.
I have a case structure for this Matlab script. And inside of case structure i applied an elapsed time function to control the timing for the matlab script, but this is not working.
Upvotes: 0
Views: 672
Reputation: 723
Yes. Short answer: I believe (one of) the reasons the program behaves weird on changed timing are several race conditions present in the code.
The part of the diagram presented shows several big problems with the code:
From Bad:
To Good:
(nevermind broken wires)
Upvotes: 1