Reputation: 555
I am running jmeter tests with 100 to 1k users successfully, But I suspect if response time is higher than expected.
My test plan include: get login and post login, get test page , post test page, get search page, post search page....
in total 5 get and 5 post forms.
For same number of users if I reduce number of pages the overall response time decreases
so should I run test for pages separately?
Should I reduce number of users for realistic numbers (5 pages*20 users=100 concurrent users)--for performance test?
Or should I be using distributed system?
What is the best practice?
Current Setup: i5, 8GB Ram, One windows machine with Jmeter 3.1
Upvotes: 1
Views: 2246
Reputation: 541
I think you could be running into jmeter issues. What is the JVM heap and GC algorithm that you are using? How are you measuring the performance of each page? If you are using "Transaction Controller" to measure the performance, any slowness in jmeter will affect your transaction controller values.
Have you correlated with the application logs to really understand that the application is indeed slowing down when you decrease the # of pages? If your application response time is constant, I think jmeter is the culprit here. Move all your measurements to the sampler level instead of transaction controllers and update the results
Upvotes: 0
Reputation: 168072
You load testing should be realistic, otherwise it does not make sense. You need to simulate anticipated users behaviour as closely as possible, only this way you will get the real life picture.
So you need to implement your test scenario to match the way, your site will be used in the real world. If it is alive already you can use Access Log Sampler to replay the traffic. If it is not, you can think about "user groups", like:
You can use different Thread Groups to represent different groups of users and Throughput Controller to control the frequency of samplers execution inside the Thread Group. See Running JMeter Samplers with Defined Percentage Probability article for more information on how to distribute the load in a realistic way.
Upvotes: 2
Reputation: 15370
There are N number of factors that will affect the overall response times. number of users / pages etc are also few of them. Do you have any specific requirement for performance test? If you are not sure of non functional requirements, then I think all your questions will be clarified in these posts -
http://www.testautomationguru.com/jmeter-tips-tricks-for-beginners/
Upvotes: 0