Reputation: 198
I'm trying to do a sum in an Excel table, but I can't figure out how to do it.
The table should look like this with the last column (Remaining) counting down the remaining budget:
A B C D
1 Project Budget Costs Remaining
-------------------------------------
2 A 110.000 10.000 100.000
3 B 25.000 100 24.900
4 A 110.000 12.000 88.000
5 A 110.000 1.000 87.000
6 B 25.000 1.000 23.900
I really hope you can help me out.
Upvotes: 1
Views: 67