Reputation: 22675
A workspace is synced to a particular changelist A
. User makes changes in the workspace and submits the changes which shows up as changelist B
. Is there a way to figure out A
given B
?
Upvotes: 0
Views: 29
Reputation: 71424
Files must be synced to the head revision before they can be modified, so as far as the files in B
are considered, A
= B-1
.
There is no requirement that all of the files in a workspace be synced to the same changelist, or that they be synced at all, and there is no way to determine given B
what revision other files were synced to at the time B
was submitted.
Upvotes: 2