Reputation: 41
I have a google sheet with around 190 tabs on that i need to split into 190 different files The files need to be named the same as the tab, the contents of the tab need to be copied as values but i also need to bring the formatting accross (just not the formulas).
I have looked around, and through a combination of previous questions and answers plus using the function list help have formed the following code. It actually works for the first few tabs but then throws up an error about being unable to delete the only sheet.
function copySheetsToSS() {
var ss = SpreadsheetApp.getActive();
for(var n in ss.getSheets()){
var sheet = ss.getSheets()[n];// look at every sheet in spreadsheet
var name = sheet.getName();//get name
if(name != 'master' && name != 'test'){ // exclude some names
var alreadyExist = DriveApp.getFilesByName(name);// check if already there
while(alreadyExist.hasNext()){
alreadyExist.next().setTrashed(true);// delete all files with this name
}
var copy = SpreadsheetApp.create(name);// create the copy
sheet.copyTo(copy);
copy.deleteSheet(copy.getSheets()[0]);// remove original "Sheet1"
copy.getSheets()[0].setName(name);// rename first sheet to same name as SS
var target_sheet = copy.getSheetByName(name);
var source_range = sheet.getRange("A1:M50");
var target_range = target_sheet.getRange("A1:M50");
var values = source_range.getValues();
target_range.setValues(values);
}
}
}
I am hoping someone can tell me what i have done wrong as I cannot figure it out at this point. I am also open to better solutions though please be aware I am very much a beginner on google appscript, nothing too complex please.
thankyou
Upvotes: 0
Views: 224
Reputation: 26796
However, mind that calls to service such as SpreadsheetApp
are asynchronous.
And this becomes the more noticeable, the longer your script runs.
In your case it apparently leads to behavior that the only sheet is being deleted before the new sheet is being created.
To avoid this, you can force the execution to be synchronous by implementing calls to SpreadsheetApp.flush().
This will ensure that the old sheet won't be deleted before the new one gets inserted.
Sample:
copy.deleteSheet(copy.getSheets()[0]);// remove original "Sheet1"
SpreadsheetApp.flush();
copy.getSheets()[0].setName(name);
You might want to introduce call to
flush()` also at other positions where it is important for the code to run synchronously.
Upvotes: 1