Reputation: 263
I have to solve a problem on a manufacturing environment where:
Is this a Job Shop or any variant problem? Is it possible to do with optaplanner? Are there too many constraints for the solver?
I know that the tasks scheduling and the requirements of each subtasks can be done, my biggest concern is with the ones that I have marked with *
Thank you in advance.
Upvotes: 0
Views: 128
Reputation: 27312
In the OptaPlanner docs, look for the Design Patterns chapter and read the section on how to design a good model and also the section on assigning to time (timeslot vs time grain vs chained).
These are 2 related video's:
Upvotes: 1